
Technical Project Summary: In 2023, Alrouf Lighting Technology acted as a specialized solutions provider for the SECCO Makkah Power Plant. The project involved the technical supply of Safe lighting systems for diesel generator rooms, where mitigating explosion risks is paramount for critical infrastructure safety.
Hazardous Area Engineering: Engineering and supply of specialized Exproof fixtures designed for Zone 2 and Zone 21 hazardous environments.
Compliance Leadership: Provision of lighting units fully complying with ATEX and IECEx standards for explosion-proof zones.
System Integrity: Technical selection of high-durability fixtures including Floodlight units to ensure continuous illumination in high-risk industrial atmospheres.
Supervision & Design: Engineering oversight to verify that the lighting layout meets the site-specific hazardous zone requirements and international safety protocols.
Technical Submittals: Formal engineering documentation for industrial material approval and ATEX/IECEx certification.
Technical Datasheets: Detailed performance specifications for the Zone 2/21 Ex-proof range.
IES Files: Photometric data confirming precise light distribution within generator shelters.
Lux Calculations: Engineering verification of illumination levels to ensure operational site safety.
Authority & Compliance: All products and solutions supplied were aligned with applicable KSA requirements (e.g., SASO) as specified in the project’s technical submittal.
To review the ATEX/IECEx certification documentation for this hazardous area solution or to discuss the engineering requirements for your next project, please contact our specialized engineering team.

